Panel Rígido Málaga2D/3D mesh panel & sheet fencing
Trench and precast base during works
Blog · on site

What can go wrong while a mesh fence is being built?

Even well-planned jobs meet surprises. Knowing the usual ones helps you judge a contractor's plan and understand why we ask so many questions before quoting.

Problems & objectionsLast reviewed: Bauman Raymond Attila

What if the post holes hit rock?

In short: footings may need breaking out rock or an adjusted design; a good contractor stops, shows you and agrees the change.

Much of Málaga province has rocky ground just below the surface. A post hole that hits rock cannot simply be made shallower without thinking about the load. Options include breaking out the rock, adjusting post positions or changing the footing. Whatever the solution, it should be explained and agreed, not added silently to the bill. We list ground conditions as a cost factor for this reason.

Old foundations are a similar story. Plots that once had a shed, a wall or a terrace often hide concrete under a layer of soil. If we find it, we show you photos and explain whether it can be broken out, worked around or used. Nothing changes in the quote without your agreement.

What if there are pipes or cables along the line?

In short: we ask for plans and look for signs before digging; if a service turns up, we move the footing or agree another solution.

Boundaries attract services: drainage, irrigation, electricity, telecom. On warehouse sites especially, cables along the perimeter are common. We ask for any plans and look for covers and markings. If we find a service where a footing should go, we stop and agree a change. Damaging a pipe or cable is the kind of problem that turns a simple job into an expensive one.

What if the levels are not what they seemed?

In short: slopes that looked gentle can turn out steeper or irregular; measuring levels along the whole line before quoting prevents most surprises.

From a photo, many plots look flatter than they are. Once the line is pegged out, steps become obvious. That is why we measure levels along the entire run and decide where steps go before the final quote. Our guide to bases on sloping ground explains the options.

What if water collects against the new fence?

In short: a continuous base can hold back rainwater; drainage should be planned at setting out, not after the first storm.

If water runs across your boundary, a closed base will stop it. On a precast base fence we plan openings or drainage where needed. After building, watch the first heavy rain and tell us if water behaves unexpectedly.

Water also matters while the work is under way. Fresh concrete in footings should not sit in a flooded hole, and trenches for a base can fill quickly in a storm. We plan concrete work around the forecast where we can, and pump or wait when we have to, rather than pouring into standing water.

What if materials are wrong or late?

In short: we check deliveries against the order before installing; incompatible parts are not fitted just to finish quickly.

Panels of the wrong height, a missing box of clips, posts for a different system: these happen. We check material on arrival and do not improvise with the wrong parts. This is also true for client-supplied material, which we check before starting.

How should problems be communicated?

In short: clearly and before acting – with photos, an explanation and an agreed change to the itemised quote.

Problems on a fence job are rarely dramatic, but they all have one thing in common: they are easier to solve when the owner knows early. The worst on-site problems are the ones the owner hears about at the end. We stop, show photos, explain the options and agree any change before carrying on. For owners abroad, this happens by photo and message. Read more on how the process works in what owners wish they had known.

BR
Bauman Raymond Attila
Author and person responsible · Last reviewed:
FAQ

Frequently asked questions

What is the most common surprise on fence jobs?

Ground conditions – rock, old foundations or fill – found when digging footings.

Will rock make my fence more expensive?

It can, because breaking out rock or changing the footing takes extra work. We agree any change before acting.

Do you check for underground services?

We ask for plans and look for markings and covers. Owners should share any information they have.

What if you damage a pipe?

We dig carefully to avoid it. If a service is found, we stop and agree a solution with you.

Can the fence line change during the job?

Only with the owner's agreement. Changing the line after footings are poured is costly.

What if delivered panels are the wrong size?

We check material on arrival and do not install incompatible parts.

Do you check material I supply?

Yes, before starting, to make sure it is complete and compatible.

How will I know about problems if I am abroad?

We send photos and explanations and agree changes before continuing.

Can rain delay the work?

Weather can affect concrete work and access. We plan around it and keep you informed.

What happens to soil from the post holes?

Removing spoil is part of our clean-up and is listed in the quote.

Get a quote

Send photos and the length of your fence line

We build the whole fence – groundwork, base, posts and panels. Send photos and the approximate length for a first assessment and an itemised quote, no commitment.