What does a mesh panel fence cost in 2026? The factors that decide it
People ask us for a price per metre. The honest answer is that the panel is only part of the bill, and the rest depends on what lies under and around your fence line.
Why don't we give a price per metre?
In short: because two fences of the same length can involve very different groundwork, bases and access, and a flat rate hides those differences.
A price per metre is easy to compare, which is why it is popular. The trouble is that it assumes every metre is the same. In practice, one metre of fence on a flat lawn with a vehicle parked next to it is a very different job from one metre on a rocky slope at the end of a footpath.
A flat rate either overcharges the easy job or leaves the difficult one underpriced – and underpriced jobs tend to grow extras later. We prefer to measure the line, look at what is under it and send an itemised quote. That way you see what each part of the fence costs, and you can decide where to spend and where to save.
Which factors move the cost most?
In short: length and height, panel type and finish, base or no base, foundations, ground and slope, access, and removal of an old fence.
These are the factors we look at on every job:
- Linear metres. More fence means more of everything, but longer runs spread fixed costs such as setting out and transport.
- Height. Taller panels cost more and put more load on posts and footings.
- Panel type and finish. A 3D panel and a 2D double-wire panel are different products; a coated finish adds to a galvanised one.
- Base. Posts straight in footings, a precast base or a built low wall each add different amounts of material and labour.
- Foundations. The ground decides the footing.
- Ground and slope. Rock, fill, roots and steps all take time.
- Access. Carrying materials by hand is slower than unloading next to the line.
- Old fence removal and line clearing, done as part of the new fence.
- Quantity and the number of corners and ends.
How can you keep the cost down without cutting corners?
In short: choose the base and panel the site actually needs, give clear access, decide the line early and avoid changes after the work has started.
There are sensible ways to control cost:
- Match the fence to the job. A rural boundary may not need a 2D panel and a built wall; a dog run may need a base but not the tallest panel.
- Clear access. If you can move cars, pots or garden furniture away from the line, the work goes faster.
- Settle the boundary first. Moving a line once the footings are poured is expensive.
- Avoid mid-job changes. Changing panel type or height after ordering adds cost.
What we do not recommend is skimping on posts and footings. The post is what holds the fence up; see our guide to posts and clips.
How should you compare quotes?
In short: compare item by item – the same length, height, panel, base, footings, removal and clean-up – not just the total.
Two totals are only comparable if they include the same work. Line the quotes up and check: is the base included? What type of footing? Is the old fence removed and taken away? Who removes spoil? Is the finish galvanised, coated or both? Are posts and clips from one compatible system?
For more on quotes and price questions across all fence types, the price-focused site in our network is presupuestovalla.eu. And if you are still choosing the panel, our 2D vs 3D comparison helps.
Articles and guides

3D mesh panel fence: the folded welded panel, properly installed
The 3D panel is the rigid mesh you see around villas and new housing across the province. We build it on proper footings, with or without a base, from setting out to clean-up.
View details →
2D double-wire mesh panel fence for sites that need a stiffer panel
The 2D panel is flat, heavy-looking and stiff, with each vertical wire held between two horizontal wires. We build it on proper footings for commercial, community and residential boundaries.
View details →
What can go wrong while a mesh fence is being built?
Even well-planned jobs meet surprises. Knowing the usual ones helps you judge a contractor's plan and understand why we ask so many questions before quoting.
View details →
Posts and clips: what really holds a mesh panel fence up
Owners choose panels by colour and style, but a mesh fence stands or falls on its posts, their footings and the clips that join everything together.
View details →Frequently asked questions
How much does a mesh panel fence cost per metre?
We do not quote a flat rate, because cost depends on ground, base, height and access. We measure and send an itemised quote.
Is a 2D panel more expensive than a 3D panel?
A 2D double-wire panel is generally a more substantial product. The total difference depends on the whole fence, not just the panel.
Does adding a base increase the cost a lot?
A base adds material and work, and the amount depends on the base type and the ground. It appears as a separate item in our quote.
Why is groundwork such a big part of the cost?
Because footings, trenches and bases take time and material, and ground conditions vary. The panel is only one part of the fence.
Does a slope make the fence more expensive?
Usually, yes. Steps need more cutting, levelling and fixings, and footings may be more demanding.
Is removal of my old fence included?
Only if it is listed in the quote. We remove old fences as part of a new fence and list it as a separate item.
Can I save money by supplying the panels myself?
Sometimes. We can install client material after checking it is complete and compatible. Missing or mismatched parts can cancel out the saving.
Do licence costs appear in your quote?
No. The licence or notice is the owner's responsibility, and any municipal fees are paid by the owner.
Can I get an idea of cost from photos?
Photos give us a first view of the job, but a final quote needs measurement on site.
Where can I read more about fence prices?
See presupuestovalla.eu, the price and quote site in our network.
Send photos and the length of your fence line